Gregory Demolition Home

Category

Commercial & Procurement

7 articles

The Stage 2 Seat: Giving Demolition a Place at the Concept Design Table

The Stage 2 Seat: Giving Demolition a Place at the Concept Design Table

Demolition is still routinely procured after planning, long after the decisions that shape it have been locked in. This piece argues that a demolition contractor appointed at RIBA Stage 2 changes surveys, waste strategy, party wall planning and the main works programme for the better - and at a fraction of the cost of unpicking them later.

Consent Before Concrete: Demolition Programming in Conservation Areas

Consent Before Concrete: Demolition Programming in Conservation Areas

Demolition inside a conservation area is an evidential exercise long before it becomes a construction one. This guide sets out how developers can sequence heritage assessment, surveys and condition discharge so that clearance work supports the planning timetable rather than wrecking it.

Reuse Before Removal: Making the Pre-Demolition Audit Pay

Reuse Before Removal: Making the Pre-Demolition Audit Pay

Too many demolition contracts are still written as disposal exercises. A properly scoped pre-demolition audit turns a building into a schedule of reusable assets — and gives developers defensible evidence for planning, carbon and cost claims.